What is the ratio of cement ,sand, and aggregate to be used
in M20 grade of concrete when excavating 200 x 200 x 200 mm
of sand from soil
Answers were Sorted based on User's Feedback
Answer / swrytery
1:1.5:3
1 part of cement
1.5 part of sand
and 3 parts of broken stones
| Is This Answer Correct ? | 19 Yes | 2 No |
Answer / sjtbehera
i do not understand your question. In is code M20=
1:1/1/2:3.
what means when excavating 200mmx200mmx200mm in sand soil.
either your question releated to bearing capcity of soil
or strength of sand or what is the minimum dstrength
recquired in sand soil. explain
| Is This Answer Correct ? | 9 Yes | 1 No |
How to find the cuplock pipe qty in staging for Minor bridge?
What is proportion of M25,M30,M35,M40 IN TH FORM 1,2,3,4?
what is difference between long column and short column?
16 Answers L&T, Tomi Polytechnic,
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
Explain what is progress payment?
where vr providing singly reinforced beam. i want to know the location of it in a building
how many nos of National highway in India.
13 Answers HBC, L&T,
How many bricks,sand,cement in 1m3 bricks masonary
3 Answers Ascent, Superior Hi Tech,
What is the difference between pressure pipe and non pressure (NP) pipe?
what is weight of asphalt concrete
what is general scouring?
what will affect low density aggregates on concrete wt?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)