What is the ratio of cement ,sand, and aggregate to be used
in M20 grade of concrete when excavating 200 x 200 x 200 mm
of sand from soil
Answers were Sorted based on User's Feedback
Answer / swrytery
1:1.5:3
1 part of cement
1.5 part of sand
and 3 parts of broken stones
| Is This Answer Correct ? | 19 Yes | 2 No |
Answer / sjtbehera
i do not understand your question. In is code M20=
1:1/1/2:3.
what means when excavating 200mmx200mmx200mm in sand soil.
either your question releated to bearing capcity of soil
or strength of sand or what is the minimum dstrength
recquired in sand soil. explain
| Is This Answer Correct ? | 9 Yes | 1 No |
how to do cementicious paint for rcc walls of cw pump house
how much of the strength comes from post-production curing
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
Difference between P.C.C and R.C.C?
24 Answers Amit Enterprises, D Link, SAT, Surya Constructions,
what is the difference between tsp & tower
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
how meny typs of renging rod?
What is the difference between auto & dumpy level
what is a well
What are the Types of foundation?
What is Rodding?
What is the cement and sand content in the mortar used to build 1 sqm of 190x190x390mm hollow and solid blockworks?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)