What is the ratio of cement ,sand, and aggregate to be used
in M20 grade of concrete when excavating 200 x 200 x 200 mm
of sand from soil

Answer Posted / sjtbehera

i do not understand your question. In is code M20=
1:1/1/2:3.
what means when excavating 200mmx200mmx200mm in sand soil.
either your question releated to bearing capcity of soil
or strength of sand or what is the minimum dstrength
recquired in sand soil. explain

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explain what do you mean by the property development.

1714


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

1987


For fine aggregate which is most suitable River sand or crusher sand & why ?

1437


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

2045


how to identify np3 pipe and np4 pipe

1644






What is rate of concrete surface rendering work per sqm

1533


why we are useing plastic under the lean concrete?and whts the advantage?

2273


can you give me the details of rate analysis of steel and concrete?

2594


Give me an example of a time when something you tried to accomplish and failed.

2612


What are the advantages of cad software’s?

780


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1642


Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

1599


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2711


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

1094


Prepare a Schedule for a Highrised building from starting stage to Handover?

1606