What is the ratio of cement ,sand, and aggregate to be used
in M20 grade of concrete when excavating 200 x 200 x 200 mm
of sand from soil
Answer Posted / sjtbehera
i do not understand your question. In is code M20=
1:1/1/2:3.
what means when excavating 200mmx200mmx200mm in sand soil.
either your question releated to bearing capcity of soil
or strength of sand or what is the minimum dstrength
recquired in sand soil. explain
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How many cement sand ballast in cc 1:4:8 40mm
What are the different types of runners?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
Describe the role of independent Quantity surveyor?
Scaffolding IS code NO.
Why the finite element method is lower bound solution?
what is the painting co efficient of slope roof tiles?
How much 1 cum of M15, M20 & M25 concrete weigh?
Please let me know what is the simplest way of Calculating Mix Designs
What are the applications of the modulus of elasticity?
load combinations how many types for staad design purpose?
What are the techniques to measure road difference?
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
what is the function of GSB all class ?