why you want more salary here then previous company???
Answers were Sorted based on User's Feedback
Answer / dhananjay
Because, whatevere expirence I had in previous compny; I
implement in this company its best.
Is This Answer Correct ? | 25 Yes | 0 No |
Answer / rbhambhu51@gmail.com
coz i want to grove up in my life.
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / riz
b coz that shod b a reason 4me 2 leave the previos job n
join u...
Is This Answer Correct ? | 4 Yes | 7 No |
How much material will consume for following specification water tank (9*7.5*6 feet)?
what opc & ppc cement $ composition?
Which Cement is good for concrete, Is that grade 33, 43 or 53?
structural engineering based
What is difference between code and standard and specification?
If we use oil,inner on the column box, it'll make rust on the column steel?
how can calculate cutting length of diamond ring
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to calculate the number of cement bags for basic construction..?
3 Answers Gammon, Indu Projects,
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
how to calculate upthrust pressure of under ground water tank in wet soil?
What is the per square fee cost of external development of a multistorey group housing project