Answer / vikas p
Consider M20 (1:1.5:3) Grade Concrete
A) Suppose Total Volume of concrete= 1 Cum.
B) Add 55% volume for dry mortar=0.55 Cum.
C) Total wet volume of concrete A+B = 1.55 Cum.
D) Cement = 1.55/ (1+1.5+3) = 0.18 Cum. = (0.18/0.035=5.14 Bags)
E) Therefore Fine aggregate = 0.18 cum X 1.5 = 0.27 Cum.
F) Therefore Coarse aggregate = 0.18 cum X 3 = 0.54 Cum.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / amit
For cement=0.158* required volume in cum/ratio factor (eg m20=1+1.5+3)
= answer/.035 which gives you no of bag
For sand=1st cement ratio answer* 1.5 which gives you cum of sand
Same for aggregate
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nilesh kulkarni
If built up area of the building is known to you ,
You can calculate the qty as per constants for any ratio
Concrete Qty:- 0.03 Cum/Sqft
Cement For :- RCC Work = 0.19 Bag/Sqft
Masonary Work = 0.08 Bag/Sqft
Plastering Work = 0.15 Bag/Sqft
Other Work = 0.03 Bag/Sqft
---Total Cement--------- 0.45 Bag/Sqft----------------------------
-------------------------------------------
Sand For :- RCC Work = 0.75 Cft/Sqft
Masonary Work = 0.36 Cft/Sqft
Int. Plastering Work = 1.00 Cft/Sqft
Ext. Plastering Work = 0.65 Cft/Sqft
Tiling Work = 0.13 Cft/Sqft
W/p Work = 0.08 Cft/Sqft
Other Work = 0.02 Cft/Sqft
Total Sand---------------- 3.00 Cft/Sqft----------------------------
-------------------------------------------
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nadim shaikh
for any quantity firstly you will need drawing of RCC members and architectural drawing
secondary you should know nominal mix ratio
| Is This Answer Correct ? | 0 Yes | 1 No |
Explain major differences between routing maintenance and major maintenance.
what is the diferance np3 and np4 pipe
1 Answers Sharda Construction,
very simple or less time consuming formula for reinforcement calculation by moment
brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum
How do you find the difference between 53&43 grade cement in site?
How are freeway bridges built?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
What is Shoe Footing ?
2 Answers Bhandari Associates,
Isolated square footing quantity calculations
what is a coupler and where do u use it ?
What is the amount of cement,sand and course aggregate(jully)(in kgs) required for the RCC of an area of 450 square feet and 5 inch depth if the concrete mixing ratio is 1:2:4(cement:sand:jully)?your answer will be very helpful.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)