how we can calculate a bentup hook in difreeent angles.for
exp.at 90 degree,45degree,60 degree..
Answers were Sorted based on User's Feedback
Answer / subhasbabu
FIRST CALCULATE STRAIGHT LENGHT BETWEEN EITHER BENDS THEN
TOP STRAIGHT LENGTHS, NEXT BEND LENGTH CAN BE DETERMINED BY
PYTHOGOUROUS THEOREM
| Is This Answer Correct ? | 0 Yes | 1 No |
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
what is the criteria for the finalisation of pavement thickness in road project?
1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
48 Answers Alcove Infrastructure, Anantha Infra, L&T, Microqual, Shoba Devlopers, SSC, UltraTech, Valdan, VVA Developers,
what is quick sand
how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.
11 Answers GRC, KEC, L&T, Techno Electric and Engineering, UPENN,
cement and sand required for one block of size 0.23*0.15*0.46
how can i determined the size of burfi ring?
1 Answers Interior Designs, Simplex,
different type of beam
Why curing is necessary for concrete
Pls explain me about tension and compression in a flat slab
States some of the commonly used commands in cad software’s?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)