Can anybody help by describing each and every step in
short, used while giving a building layout by total station?
Regards
No Answer is Posted For this Question
Be the First to Post Answer
ground floor columns and beams are reinforced by 4 Num's 16MM @ Corners AND 2 Num's 10MM @ centre.... And the nxt top floor columns and beams were lapped by 8 num's 12MM dia bars..... IS THIS CORRECT ????
in the footings first which reinforcement bar has to be layed as per design criteria.
How Much span required for 1 sqm of shuttering(Beam & Slab)
what is Brest Wall?
Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
why mixing marble powder reduces setting time of cement
In pile foundation which kind of action are take place?
extra how much quantity need to fill the actual excavated quantity.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
0 Answers L&T, Rail Vikas Nigam Limited RVNL, RRB,
whou haat goals do you have in your career
for mortar 1:18 how much cement and sand required for 1 CM
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
0 Answers GAIL, KOC, Megha Constructions,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)