What is the ratio of cement ,sand, and aggregate to be used
in M20 grade of concrete when excavating 200 x 200 x 200 mm
of sand from soil
Answer Posted / swrytery
1:1.5:3
1 part of cement
1.5 part of sand
and 3 parts of broken stones
| Is This Answer Correct ? | 19 Yes | 2 No |
Post New Answer View All Answers
significance of specific surface area of particles?
What is the distance between railway tracks?
What is construction mitigation management?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
What is rolling stock
how statics is different from dynamics
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What is absolute coordinates?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is the density of most of construction materials?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
What is Critical path in Ms-Project ?