they conducted technica for 1 hour..i also managed..they
selected 5 boys and only one girl,myself got wait
listed.whether they would call or not
Answers were Sorted based on User's Feedback
how we calculate capacitor bank mvar for 11 kv distribution networ , and i need releation between capacitor bank with voltage, frequency, current, pf
what is meant by k-rating in isolation transformer?what is k9, k14 stands for?
which power plant has high load factor?
toughest decision you ever had to make
How to calculat size of copper & aluminium ?
what is the safty of poly phase tranformer?
why we use 630mm single core cable for transformer secondary side and why two neutral cable
1.two coupled coils with L1=L2=0.6 H have a coupling coefficient of k=0.8 the turns ratio N1/N2 is......
How you will determine the volume of oil in a particular Distribution transformer.
What is phase in electrical engineering?
Why SF6,VCB,Oil Ckt Breakers are use in HT Side need brief information ?
How to calculate HV Cable Sizing & what are the factors to be considered for selection?.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)