11KW Delta motor is taking about 44Amps in star and goes
upto 70Amps in delta and trips OFF. The rated current is
26Amps. Application is for the blower. The motor takes ( no
load without coupling impller ) only 2.5A and 5Amps in star
& delta starter test.Need to know why its taking high
current.
Answers were Sorted based on User's Feedback
Answer / rajendran
The motor takes very less current at no load than the
normal and when it is loaded it is taking the obnormal
currents even in delta operating mode....
it seems there must be a problem in the connections or in
the supply voltage of the mains or improper impeller
arrangement causing very high load.
probably there may be a problem in the connections only...
check the connections
| Is This Answer Correct ? | 9 Yes | 4 No |
Answer / rajesh vallem
in blower applications before starting the motor damper
should be in close position.motor concerned it is ok
because no load current of the motor is ok.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / gunasekaran
u r not explain proberly it is due to inrust current for
star phase voltage=VL/sqrt3
for delta phase voltage=line voltage so it is taking more
current than star.normally at stating motor taking 5to 6
six times of the full load current i think nothing wrong u
can incress the relay setting and then start the motor
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / boby
I think there is something wronng with imppller coupling
it alingment could be out. Because no load current of
motor is ok . So check the coupling alignment , motor
bearing and connection of input cable at main source.
| Is This Answer Correct ? | 1 Yes | 1 No |
In Blower application, starting current will be more than
normal until it gets full speed due to dampers, hence
better idea to use OLR with starting current delay time and
running current delay time setting. so that while starting
time this OLR waits for some time delay even starting
current is more than normal and trip.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / tj
Following is the check seq. :
1 Check for correct DOR/Phase Seq, ensure termination is
correct n tight.
2 Check the relay for malfunction & its type if it is
thermal then increase setting a bit more than ratd amps &
chk, n if its micro proc based then adjust the setting
acording to motor starting curve.
3 Ensure that suction damper is at min. before starting.
4 Ensure the motor is correct according to fan torque.
5 Check for any abnormal sound or play from fan side.
6 Also check the cable, it should not be underrated, causing
higher potential drop at startup.
Hope the above helps you........
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / anil bhatia
check rated current as you mentioned 26 amps
according to chart it should be 19/20 amps
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / felixraj
check the coupling alignment,blower condition(bearing)
| Is This Answer Correct ? | 1 Yes | 5 No |
Answer / suraj_ojha
I am agree with mr.rajendern there is some mistake is in
their control wiring of starter.
| Is This Answer Correct ? | 0 Yes | 5 No |
Readings of ER300P Trivector meter
why tan delta test conducted in electrical equipmenr
what is swirl induction in i.c engine????????
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
why we use salt for earthing?
Is single load(eg: three phase motor) having all the components like positive,negative,zero sequence components during fault condition?
The D.C. spark test is applicable to single conductor cable & assemblies of insulated single conductor cables without insulation shield,metallic sheath or metalic armor?
our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.
I am working in 600MW power plant currently in erection phase. I came along this term and want to know its meaning in simple language, consider me naive!?? All motors shall be of energy efficient type EFF-2 as per IS:12615/ equivalent IEC / International Standard.
i am trying to PSUs/govermeant jobs since last 2 years but still i m not success, plz help me.
what is electric current
what meaning of gd squre
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)