11KW Delta motor is taking about 44Amps in star and goes
upto 70Amps in delta and trips OFF. The rated current is
26Amps. Application is for the blower. The motor takes ( no
load without coupling impller ) only 2.5A and 5Amps in star
& delta starter test.Need to know why its taking high
current.
Answer Posted / mohammed raffi
In Blower application, starting current will be more than
normal until it gets full speed due to dampers, hence
better idea to use OLR with starting current delay time and
running current delay time setting. so that while starting
time this OLR waits for some time delay even starting
current is more than normal and trip.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is an Air COmpressor
if sf6 gas low in gis what will happen
what types of electrical & mechanical test conducted in switchyard?
why do we use 25kv supply for traction purpose?
Write the programming software name for LG, SIEMENS,Messung,AB
33kv Rated output avilable in market (any where in india)
which are the criterias needed to select the kind of neutral earthing(solid earthing,resistance earthing,etc.) at various voltage levels in electrical distribution?
Why cables and busbar both needed in LT Panels?
How to run a three phase motor into single phase........
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
I am a electrical engg. diploma holder,applied for junior engineer (electrical),Kolkata RRB. Have I to attend all electrical,mechanical&civil portion in written exam.???
What is an order of a system.
"TRANSFORMER MODELING AND ANALYSIS" MEANS WHAT AND WHICH TOPICS U READ IN THIS
If only R Phase is connected in 2 pole elcb, n is not connected than it will work or not in ground fault.
What are the difference between CT/PT operated Meter and RRAMR Meter for HT/LT application?