Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why we do design mix of concrete when there is nominal
method using the IS-Code available ?

Answers were Sorted based on User's Feedback



Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / mallikarjuna (nitw)

to ensure required |Target Mean Strength by controlling the
parameters of aggregate,sand and water accurately ....n
also to design higher grade of concrete ...

....incase of nominal mis method(say),M15 means 15mpa
comp.srength on 28 days using 1:2:4 proportions without
considering various conditions of conareting
materials ...the same will be rectified in design mix .

simply nominal mix is blind technique where as design mix
is live n vibrant method of mix design in concrete
technology to achieve anticipated TMS.

Is This Answer Correct ?    46 Yes 3 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / aasinghai

to achieve economy and safety

Is This Answer Correct ?    34 Yes 4 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / arunkumar.t

to save an optimum content of cement, from 7.5 to 8 bags of
cement to 6.6 bags of cement per CuM

Is This Answer Correct ?    28 Yes 11 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / sudheer

To acheive best possible concrete with the ingredients
available at particular location design mix is used.

Is This Answer Correct ?    17 Yes 1 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / santosh

design mix of concrete give the exact quantity of material
such as cement, sand, aggregate & water.so that economy in
the material can be possible. higher strength of concrete
can be achieved with min. content of admixtures

Is This Answer Correct ?    12 Yes 0 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / nagori salim

The basic difference betn the two is;

Nominal - Volumetric Batching.

Design - Weight Batching.

In design mix degree of quality & control on quantity is
highly maintained.

Is This Answer Correct ?    12 Yes 2 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / subhendu,jadavpur

In the code specified ratio there is no any consideration
of workebility, which in one of the mandetory aspects to be
considered. But by mix design we can design the concrete of
required workebility without sacrificing the strength.

Is This Answer Correct ?    8 Yes 1 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / raju mandal

Because the properties of available material is varies from
site to site.It is preferable because we want to get
strength of concrete at optimum cost.You can use nominal
method of mix if you are able to provide standard
characteristics to the all material.

Is This Answer Correct ?    7 Yes 1 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / sailesh kaw

Design mix is carried out for the optimization of concrete,
to increase its durabilty and to decrese its permeability.
WC ratios is also reduced.

Design mix is based on the specific weights of the material
where as 1:2:4, 1:3:6 etc are volumetric based design

Is This Answer Correct ?    7 Yes 2 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / rakesh kumar mallik

By design mix of concrete we can achieve more workable
concrete without hampering the strength of concrete which is
not possible in nominal mix of concrete.
By design mix we have have control over the quantity of
material,water cement ratio to achieve the required strength.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

0 Answers  


15. List 3 of your weakest points as a worker?

2 Answers  


why cracks develop at the upper corners of doors openings

1 Answers  


Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft

4 Answers  


What is "Bending moment"? Demonstrate on theory not for formula.

3 Answers  


What is the cost of Brickwall ( 4")(1:4) thick wall total Area 245 sqft with plaster(1:6). With all materials including.

5 Answers  


What is zoning permit?

0 Answers  


Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

0 Answers  


What is the cement and sand content in the mortar used to build 1 sqm of 190x190x390mm hollow and solid blockworks?

2 Answers  


cement consumption per square feet in multi storeyed building

9 Answers   Dhar Associates,


Formula of mid span bar

0 Answers   Modern Construction Company, PFPL,


WHAT IS TEAM SIZE IN CONSTRUCTION WORK

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)