1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answers were Sorted based on User's Feedback
Answer / hussain
Volume of 1 Brick = 0.230*0.115*0.075 = 0.002
So No of brick req for 1 m3 = (1/0.002) = 500 Nos
1.7 bag of Cement required
0.31 cum sand required for 1 cum of brickwork
| Is This Answer Correct ? | 717 Yes | 234 No |
Answer / raja j
brick size in meter=.23*.115*.075 =.0019
add 10 mm mortar for ech sides=(.24*.125*.085)=(.0025)
bricks required for 1 m3 =(1/(0.0025)=400 nos
mortar required =(.0025-.0019)*400=.24
add 15% for wastage = (.24*1.15)=.276m3
so required sand is =.276 m3
cement is =(1440/6)=240*.276= 66 kg
| Is This Answer Correct ? | 283 Yes | 135 No |
Answer / ajeet kumr bhatnagar
Actual brick size 230*115*76
So No's of bricks in 1 m3=1÷.23*.115*.076=498nos
Now consider 10mm thick mortar
Now bricks size =240*125*86cm
No's of bricks in 1m3=1/.24*.125*.86=388nos
5% wastge=388+20=418nos actual
Mortar 498-388=110nos bricks
=110*.23*.115*.076=.22m3
30% for dry volume=0.286m3
Wastage 5%=0.015
Net volume=.286+.015=.3(approx)
Cement=.3÷7=0.042=.042÷.0345=1.24 bags
Sand=.042*6=.252m3 or.252*35.28=8.89cft
| Is This Answer Correct ? | 161 Yes | 30 No |
Answer / tipu sultan
standard size of brick
=(.19×.09×.09)m
volume of brick
=(.19×.09×.09)m^3
=0.001539
=0.00154m^3
with mortar brick size
=(.20×.10×.10)m
& volume=
=(.20×.10×.10)m^3
=0.002m^3
for volume 0.002m^3 then no. of brick=1
so that
for 1m^3 then nos. of brick = 1÷.002 = 500nos.
| Is This Answer Correct ? | 136 Yes | 18 No |
Answer / ajeet kumar bhatnagar
consider brick joint 10mm.
Brick volume 0.23x0.115x0.76=.0020m3
So for 1m3 brick work brick required=1/.0020=500nos
Now taking joint ,volume =.240x.125x0.086=.00245
Now for 1m3 brick work brick require=1/.00258= 388nos
So mortar volume =500-388=112nos brick=112x0.0020=0.32m3
For 1:6 mortar Cement 1/7x0.320=0.0457m3=0.00457/0.0345=1.32bags=1.32x50=66 kg
Sand=6/7x0.32=.274m3x35.28=9.67cft
| Is This Answer Correct ? | 67 Yes | 14 No |
Answer / md.furqan anasri
Bricks :395
Cement:1.25 Bags (CPWD)
C-sand:10 cft
| Is This Answer Correct ? | 88 Yes | 42 No |
Answer / b.jagan
Per 1m3 B.W required materials
Brick=500mom's
Cement=75kg
Sand=10.5cft
| Is This Answer Correct ? | 32 Yes | 14 No |
Answer / asmar ahmed
cement = 1.40 Bags
sand = 10.50 Cft
Bricks = 466 Nos
| Is This Answer Correct ? | 33 Yes | 20 No |
What is the full form of BHEL? A) Bharat hydroelectricity Limited B) Bharat Heavy Electronics Limited C) Bharat Heavy Electricals Limited D) Bharat Heavy Enterprises Limited
how to prepare Steel schedule or Bar bending schedule.
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
0 Answers Ministry of Agriculture,
what is advantage of vdf flooring ?
what is the function of GSB all class ?
what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???
07. 4 main points about check list for rebar works are– ––
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
how to calculate the steel for beams and columns for tender purpose? any formula have?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What are the different methods for drawing an arc?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)