What is high adherence steel bar? I have a general
specification which refers to High Adherence steel bars,
coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is
this just general re-bar or is there something different
about it? The spec originated in France.
No Answer is Posted For this Question
Be the First to Post Answer
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
please i wont to know the full meaning of P V C
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
how to convert kg/m3 to cu ft
How much is the curing time period?
Rate analysis of Vitrified tile in cement mortor 1:3
0 Answers Design Space, Muthoot Group,
how many cement and sand required for 1m2 plastering 1:4 cm
What is the use of water table & Kreb stone for drain
how do understand the plinth beam croos section diagram
how to calculate estimation for puttey... give me an example
what is the difference between highway and motorway?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)