Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / santosh
design mix of concrete give the exact quantity of material
such as cement, sand, aggregate & water.so that economy in
the material can be possible. higher strength of concrete
can be achieved with min. content of admixtures
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
How many days should curing of plastering, brick work and concrete
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
how to calculate quantity of bricks in circular manhole with examples.
How many square meter can mason layout chb per hour
Stringer How many cm goes to landind
what is Bearing Capacity,How to determine it?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What should be the standard roof height like to be?
Which is the direction of negative angle?
what is differences between ferrock and concrete ?
why we use aggregate,sand with cement in concrete?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
Explain why concrete barriers have curved surface profiles?
what is mc arther pile?