Why we do design mix of concrete when there is nominal
method using the IS-Code available ?

Answer Posted / aasinghai

to achieve economy and safety

Is This Answer Correct ?    34 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3721


How much quantity of cement,sand,stone used to build 1 cum of cc road??

1328


Explain what is progress payment?

718


How to calculate brick work quantity?? Block work quantity??

2116


how to calculate weight of 1.8 cum of aggregate

1299






in the construction of residential building what type of tank are used?where?why & what is its purpose?

1913


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

1545


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2372


What is Rankine Cycle?

669


what is w/c ratio in dry lean concrete for m10 mix design

7993


What is the worlds largest concrete dam?

717


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1693


How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight

1442


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7058


What is a projection line?

715