Why we do design mix of concrete when there is nominal
method using the IS-Code available ?
Answer Posted / arunkumar.t
to save an optimum content of cement, from 7.5 to 8 bags of
cement to 6.6 bags of cement per CuM
Is This Answer Correct ? | 28 Yes | 11 No |
Post New Answer View All Answers
how to calculate the weight of concrete
What is 1/8 on the architect ruler denotes?
What is Critical path in Ms-Project ?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
whats is difference between anchorage length and development length
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
Will going from a 3-tap to 6-tap increase water pressure?
Define What are the uses of alloys in daily life and how are alloys made?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
what is directivity effect?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
What is geopolymer based concrete?
What are the main reasons for conducting pull-out tests for soil nails?