what is difference between group BOM and BOM group ?
Answers were Sorted based on User's Feedback
Answer / mukesh bafana
A bill of material that is not assigned to a plant.
A group BOM is valid across the entire company.
Special features of group BOMS:
A plant check is not carried out for the materials in a
group BOM.
A group BOM is not exploded in material requirements
planning and in the production order.
Group bills of material are mainly created in the design
phase and then later assigned to one or more plants for
production.
A collection of bills of material that lets you describe a
product or a number of similar products.
The following bills of material comprise a BOM group:
All the variants of a variant BOM
All the alternatives of a multiple BOM
Is This Answer Correct ? | 30 Yes | 3 No |
Answer / alapini kasture
BOM Group:
A collection of bills of material that lets you describe a
product or a number of similar products.
The following bills of material comprise a BOM group:
All the variants of a variant BOM
All the alternatives of a multiple BOM
Group BOM:
A bill of material that is not assigned to a plant.
A group BOM is valid across the entire company.
Special features of group BOMS:
A plant check is not carried out for the materials in a
group BOM.
A group BOM is not exploded in material requirements
planning and in the production order.
Group bills of material are mainly created in the design
phase and then later assigned to one or more plants for
production
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / zaheer
group BOM is created during R&D stage, whcih does not have
any impact in material allocation agaist order. Also not
considered by MRP.
BOM group is a catogorizatoin of BOM's similar to the
classification of materials. for ex. Variants BOM's
Alternate BOM's.
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / prabhu
Group BOM: BOM with out plant which is in the development stage.
BOM Group:Standard BOM with referance to plant
Is This Answer Correct ? | 1 Yes | 3 No |
Answer / javed naseer
Group BOM:- Group BOM is a type of B.O.M like simple B.O.M,
Variant B.O.M, Multiple B.O.M.
It is made without reference of any plant after creating
it, we can assign it any number of plants but in this case
internal number of B.O.M will remain same & also any change
to main bom will effect every bom where they are assigned,
but if we will make any b.o.m from this group B.O.M by copy
through than internal number will be change & in this case
change in main bom will not effect other bom.
B.O.M Group:- When we create a B.O.M a bom group is given
Is This Answer Correct ? | 4 Yes | 15 No |
If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
Is it possible to convert a 'multiple bom' into a 'variant bom'?
What is process keys
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is Individual and collective requirements and differecne between them in MTO scenario?
what is the difference between PP and PP-PI? Which one is better and how? Please explain some body in detail.
Differentiate ‘variant bom’ from ‘multiple bom’?
What are commmon tickets in SAP PP in support project,examples?
how many times pcc can run for one material?
What is the planning horizon?
How do you do capacity planning ?
What is phantom item & sub contracting