what is difference between group BOM and BOM group ?

Answer Posted / zaheer

group BOM is created during R&D stage, whcih does not have
any impact in material allocation agaist order. Also not
considered by MRP.
BOM group is a catogorizatoin of BOM's similar to the
classification of materials. for ex. Variants BOM's
Alternate BOM's.

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to insert an inspection checkpoint at the end of an operation?

736


Difference between PP and PI.

1611


What does the use of ms70 followed by mcec get you?

637


What is known as 'demand management'?

654


What is the planning horizon?

660






Mention what is the t-code for changing production order and to display production order?

639


Why is work scheduling required for semi finished and finished products?

581


What is the use of stock requirement list?

651


What are some important tables used in pp (production planning)?

605


What is the difference between stock transport order and stock transfer order?

602


In implementation stage tell some standard scenario before AS-Is & TO-BE

1388


Can we create production order without bom and routing ?

666


Explain what happens to planned after it has been converted into production order?

558


We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?

626


We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?

695