what is difference between group BOM and BOM group ?
Answer Posted / alapini kasture
BOM Group:
A collection of bills of material that lets you describe a
product or a number of similar products.
The following bills of material comprise a BOM group:
All the variants of a variant BOM
All the alternatives of a multiple BOM
Group BOM:
A bill of material that is not assigned to a plant.
A group BOM is valid across the entire company.
Special features of group BOMS:
A plant check is not carried out for the materials in a
group BOM.
A group BOM is not exploded in material requirements
planning and in the production order.
Group bills of material are mainly created in the design
phase and then later assigned to one or more plants for
production
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is scheduling
what are the problems you faced in MRP?
What parameters you maintain in “plant parameters” in configuration?
What is pi sheet
What is the standard info set?
Explain different inspection type you used .
Explain source inspection.
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
Mention how mrp (material requirement planning) types are classified?
Overlapping and splitting, where do you assign?
Difference between PP and PI.
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What is Auto GR?
What is scope of planning?
What is meant by payscale structure? How did you configure payscale structure?