Is it possible to convert a 'multiple bom' into a 'variant bom'?
No Answer is Posted For this Question
Be the First to Post Answer
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
In SAP PP,how do you have relation with end users?
what do you mean by opening periods
What is collective order. Pre requisite of the collective order?
what do you mean by planning time horizon
How to delete a group of products that was created in screen mc84 ?
i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
a company needs 12 standard values. how it can be maintained?
what is backflush? what are the benefits of back flush?
How many standard value keys can you mention at work center