Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is difference between group BOM and BOM group ?

Answer Posted / mukesh bafana

A bill of material that is not assigned to a plant.

A group BOM is valid across the entire company.

Special features of group BOMS:

A plant check is not carried out for the materials in a
group BOM.
A group BOM is not exploded in material requirements
planning and in the production order.
Group bills of material are mainly created in the design
phase and then later assigned to one or more plants for
production.

A collection of bills of material that lets you describe a
product or a number of similar products.

The following bills of material comprise a BOM group:

All the variants of a variant BOM
All the alternatives of a multiple BOM

Is This Answer Correct ?    30 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Difference between MD01, MD02 and MD03.

12389


what is alternative item group

2439


Difference between different strategy groups.

1543


If u maintain sub-contacting where and how will be reflect

2226


Explain about rough cut planning

1826


What is a ‘work center’ in pp?

997


What parameters you maintain in “plant parameters” in configuration?

2298


In the monthly lot size proc, how to generate lot at the end of Period?

4421


What are dynamic actions? Give a few examples. What are it’s you used in them?

1059


what are the settings needed for variant configuration?

2008


Integration between PP and QM Module.

1803


What is the use of stock requirement list?

1138


How do you restrict the data to be entered in the payroll area?

1069


Where have we to specify the teardown time in one operation?

1031


What is plm (product lifecycle management) in sap pp?

1027