what is the difference between PP and PP-PI?
Which one is better and how? Please explain some body in
detail.
Answers were Sorted based on User's Feedback
Answer / yatin sharma
PP--> Prodction Planning mostly used for descrete type of
industries , where at the time of confirmation the output is
sure to be fixed. eg Automobile
PP- PI--> Production Planning for Process Industries , here
mostly used for the typical chemical industries , as the
Yield is not fixed due to chemical reaction yield values can
be varied to noticable extent. Eg X+Y =Z some 10 kg of X
and 1 KG of Y givs yiled that is Z of 10 Kg only.
Hope this clears some point of yours.
Is This Answer Correct ? | 31 Yes | 9 No |
Answer / louis
PP --> Is used for Discrete & some times Repetative
Manufacturing wher no Interfacing is required from external
systems. (Typical 'Make-to-Order' scenario's, automotive,
bicycles etc).
PPPI --> Is used where Interfacing whith external Systems
is required. (Example: In the Mining Industy whitch
interface with Conveyor belts, Volume meters/for Water and
Production Quantities etc.) This is typical 'Make-to-Order'
type of production.
Is This Answer Correct ? | 3 Yes | 25 No |
Why is work scheduling required for semi finished and finished products?
Which BOM item category you have used?
what is SOP ? define it .
Can we have more than 6 standard values in standard value key?
What is the difference between by-product and co-product and how do you differentiate them in a BOM?
i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Explain what is the meaning of exploding a bom?
How the process time is calculated in a wc when both labour, machine categories exist?
What is REM or What is REM profile
Explain the lsmw and the steps involved in them.
What is planning horizon?
What r different reduction startergies in SAP PP?