What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
No Answer is Posted For this Question
Be the First to Post Answer
what are the problems you faced in MRP?
Integration between PP and MM Module.
1000 pieces you run mrp on that time use md02 or md01
Can i create Production order without bom and routing ? lakshman
Difference between base unit of measure, production unit, order unit
What is a ‘bom’?
Once the Production order is created, how to change the BOM and routing in that order?
What is scope of planning?
What is mrp group and what is the use of it?
Explain In-process inspection.
What r different reduction startergies in SAP PP?
How can you create production order without routing and BoM?