You want to integrate pp with fico. What steps would you take?
No Answer is Posted For this Question
Be the First to Post Answer
• What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
What are the t-codes for creating, changing and summarizing bom?
What MRP does with Capacity overload
Explain LTP.
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
what is the meaning of explodinG a BOM
Explain service level agreements
What are all the settings done for configuring the integration of pp with fico?
Have you used Pull list or back flushing in REM?
What r different reduction startergies in SAP PP?
What is alternative BOM, or diff between BOM group and Group BOM?
What is planning file entry and Where can we use