what do you mean by planning time horizon
No Answer is Posted For this Question
Be the First to Post Answer
Integration between PP and PM module.
How many levels of Flexible Planning are there?
What is Material status and which view of the material master it is available?
What is MTS and MTO and the difference between them?
Do you need a complete history of your BOM changes? For what reasons (documentation, different technical states in operational areas, other)? For what types of BOMs? From what point in time (initial released status, other)?
Difference between standard cost and variable cost.
Explain why their is need of production version ?
What are all the steps involved in Variant Configuration?
Describe control key utility & also standard key ? how many fields can be configured for standard value key?
define variable cost
How mrp (material requirement planning) types are classified?
What are the t-codes for creating, changing and summarizing bom?