What is SOP and types of SOP?
No Answer is Posted For this Question
Be the First to Post Answer
What is opening period?
What is costing? How it is affected the pp?
If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
Explain what is PRT – how many types of PRT is used?
Do you need to use different BOMs for different applications, such as Production, Engineering, Plant Maintenance, and Costing (BOM usage)?
Difference between Manual reorder point and Automatic reorder point.
What is end user training
What is serial number and where you will be configure
Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
What r different reduction startergies in SAP PP?
What is the role of an administrator in pa?