We get an error message "Control parameters for scheduling
not defined" while creating test production Orders. Why?
Answer / guest
Before you attempt creating Production orders, configure your
Order types- Transaction Code OPHJ
Order type Dependent parameters - Transaction Code OPL8
Backorder Scheduling - Transaction Code OMIH
Scheduling Levels - Transaction Code OMIF
Is This Answer Correct ? | 3 Yes | 5 No |
What is Schedule Margin key. How floats works in scheduling?
1. how Product Cost Collector Works? 2. What are the master data for MRP? 3. In a production order without making goods issue, i should not be able to do goods receipt. How do we do it? 4. i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done. 5. for in-house production, planned order are generated & for external procurement purchase requisition. i want, system will go in external procurement to a particular vendor. what is the setting? 6. what are the problems you faced in MRP?
What are the three 'mrp procedures'?
What is golive actually? What is the role of a functional consultant in golive actually?
Explain how the pp module is organized in sap?
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
What is the difference between indian and us payroll?
Special Procurement type 40 – proc. form alt. plant
You want to integrate pp with fico. What steps would you take?
Do you have any idea about Capacity Planning?
What are the common questions,asked at SAP PP Full time face to face interview?