how we can estimate the M50 concrete for foundation?
Answers were Sorted based on User's Feedback
Answer / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / satya
quantity comes in cum,i.e length x width x depth.its depend up on shape of foundation.
| Is This Answer Correct ? | 0 Yes | 3 No |
What is "L" provided at the base of column??
what is BOQ? BOQ IS US IN ESTIMATE
what is directivity effect?
WHAT IS YOUR CURRENT SALARY
What is min thickness,min grade of conc & age of PQC ?
when we workout quantities of reinforcement steel , whate are the critari of lap length for column
if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
Please let me know the simplest way of Calculating mix designs for any grade.
What is the 162 in steel weight formula?
how much bags of cement will be in 1 cmt of having the ratio 1:3:6
how will calculate the lift load in high rise buildings
Why did you choose this career?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)