if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
Slab quantity
How to calculate manhole brick work quantity.
1 Answers ABC, L&T, Renaissance International, RR Constructions,
What is portland cement
what is mean by Face bar using in coloums?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the slope of vertical wall ? quick ans
What is Reason of Alkali-Silica reaction in Concrete mix and its remedies?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
I want to know about history of civil engineering?
how many bags of cement required in neat cement finish per square metre
Explain moment of inertia and its importance.
Should vertical shuttering done for CC/ RCC for Damp Proof Course (DPC) be measured?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)