if a pipe those configuration (ASTM c 76 class b 450mm dia
2500mm length) fixing for water course those lining of water
is 7000 running meter.
my question is that if 8 joints of pipe ls leakage and we
have not permission to stop the water so which treatment we
apply on joint in that in condition.
No Answer is Posted For this Question
Be the First to Post Answer
How many solid blocks can build one mason per 8 hours?
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
what is the breaking strength of wall tiles
WHICH BOOKS ARE AVAILABLE FOR CIVIL MPSC
Heat gain in buildings is best resisted by
6 Answers AIEEE, B Arch, JMC Projects, Unique Dream Builders,
what is the minimum and maximum thickness of plaster.?
What is alternate bid?
crank types
how to calculate the strength of rebound hammer test reading in building construction ?
WHAT IS THE MINIMUM WATER CONTENT PER ONE BAG CEMENT FOR M20 CONCRETE
how much should we assume for the weight of foundation ??
what is polity