how we can estimate the M50 concrete for foundation?
Answer Posted / satya
quantity comes in cum,i.e length x width x depth.its depend up on shape of foundation.
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
How can I make justification between using concrete grade c35 compare c37?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What is the difference between yeild strength and compressive strength of steel???
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
Explain the mechanism of cavitations in pipes and drains?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Why should you show Client/Engineer activities clearly on the project plan?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
material used for mendrel use to bend epoxy coated rebar
How will you reduce the concrete flow after mixing the concrete
How many % we consider for lap for reinforcement for estimates
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks