H/3(A1+A2+underwrote 4AM) where is the h is the height of tepar of footing A1 is the area of column size area and A2 is the fotting is the base area AM is the mid point .so end
| Is This Answer Correct ? | 5 Yes | 4 No |
What is geopolymer based concrete?
How to find permissible diagonal tensile stress in reinforced brick work
Is the ratio fixed for M-20,M-25,M-30,M-35....grades of concrete??
2 Answers Ahluwalia Contracts, L&T,
how we can calculate the capacity of a proposed canal in a command area.
5 Answers KPL, MPPSC Madhya Pradesh Public Service Commission,
how many reputations of ply wood for concrete works can be used?
steam curing is not used in which cement
what grade of concrete to be used for lintel when reinforced with bamboo in place of steel?????????
describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Types of Water Proofing Material?
rate analysis for cement pointing 1:4 , for 100 sq m
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)