Answer / shadavali123@gmail.com
H/3(A1+A2+underwrote 4AM) where is the h is the height of tepar of footing A1 is the area of column size area and A2 is the fotting is the base area AM is the mid point .so end
| Is This Answer Correct ? | 5 Yes | 4 No |
How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?
How to check Diameter of Np2 rcc pipe?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
What is the Allowable silt content of sand for construction purposes?
What is the meaning of TMT on Steel rebars
how we calculate the grade of the Bituminous materials.?????
How to find the material quantity in a cement Sand mortar for Stone masonry?
y we need to take 28 days strength as compressive strength ? y cant we take 30 th day
how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t
What are the tests to be conducted on cement?
how can we find out the ratio of cement and sand in plastering
what is the difference between two way slab and flat slab? what is the benifits of flat slab?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)