Answer / santosh kumar
The pavement in which no elastic property when aheavy
vehicle is moving on the road then it is cracked.No load
transfer layer to layer.rigid pavement is also known as
concrete pavement.
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / ptcool
rigid pavement is nothing but the pavement made of cement
concrete slab.similar to the flexible pavement it also
consist of a subgrade,base course; oly the top course
varies.The top course will be asphaltic or bituminous
material for flexible pavement and cement concrete in case
of rigid pavement.The cost of construction of rigid pavement
is quite large.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / rahul agrawal
rigid pavement is type of pavement in which cement concrete
is used with reinforcement also for pavement surface.in
these type of pavement the load of the vehicle not transfer
layer by layer to the soil such as flexible pavement.in
these surface four sub layer consisting which are surface
course.sub surface course ,base course,soil sub
grade..........rahul agrawal rungta raipur
| Is This Answer Correct ? | 2 Yes | 0 No |
what is 3.14 indicates for cutting length of stirrups
how many litres of enamel paint required for 5000 sft of site??
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
Why we do design mix of concrete when there is nominal method using the IS-Code available ?
14 Answers Engineers India Limited,
sir please send me campus placement questions in civil engineering
tell me height of colum casting if slab height 3mtr beam thikness 500mm and slab thik 150mm please write formula sir
cement consumption per square feet in multi storeyed building
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
What is meant by solid geometry?
what is density on steel bars?
Rate analysis of painting
Difference b/w tor steel or tmt bar
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)