how we can estimate the M50 concrete for foundation?
Answer Posted / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
how do you stabilize a waterlogged area in road construction
why the profile of shell of natural draught cooling tower is hyperabolic.
what is work of planning deptt. in any construction compny (in road project)
Gidc technical que paper
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
What is thumb rule in quality and quantity estimation of a Residential building??
what is the ingredient value of 40mm and 20mm aggregates?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What are the Types Of DPC and its Thickness used?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
how calculate the bearing from two coordinates?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS