how we can estimate the M50 concrete for foundation?
Answer Posted / veer singh
you asked prepared A Estimate M-50 Concrete of foundation
First So, Depend A estimate at site because your site required is M-50 concrete So, it is justified the site is very critcal.
this is a Detail of estimate
S.no. description no. no. length width hieght Qty. unit
1 E/WinExcavation (As per site required)
2 E/W in surface (As per site required)
3 P/L Concrete M-10 (As per site required)
4 P/L Concrete M-50 (As per site required)
May be or may be not
5 Steel (As per site required)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the tensile strength of marble?
How high should the water tank be to provide a 60 psi at base of this water tower?
Time required for curing of wall tiles before fixing
why development length = 50D . why not 100D
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
Which is stronger solid steel rod or hollow steel pipe?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
what is escalation?how it is done?
what is the percentage of silt in black cotton soil.?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
what is the mix design for M:60 with micro silica andmetakaoline?
though u r a civil engineer, y r u interested in tcs???
i want texture painting pwd data