1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / ajeet kumar bhatnagar
consider brick joint 10mm.
Brick volume 0.23x0.115x0.76=.0020m3
So for 1m3 brick work brick required=1/.0020=500nos
Now taking joint ,volume =.240x.125x0.086=.00245
Now for 1m3 brick work brick require=1/.00258= 388nos
So mortar volume =500-388=112nos brick=112x0.0020=0.32m3
For 1:6 mortar Cement 1/7x0.320=0.0457m3=0.00457/0.0345=1.32bags=1.32x50=66 kg
Sand=6/7x0.32=.274m3x35.28=9.67cft
| Is This Answer Correct ? | 67 Yes | 14 No |
Post New Answer View All Answers
it is possiblee to produce concrete with out cracks...
What is the origin of name railway sleepers?
why building got air crack? if it get in one particular are what is means?
why does the most of civil engg is not intersted to going for teaching field?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
I need to constructive work in amaraj batteries
may i know the detailed description of cutting length
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
how gradation of aggregates effect on slump of fresh concrete?
What is the software used in civil engineering?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
at which depth the construction of tunnel is economical from cost and engineering aspect.