Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what"s the cement, sand, aggregate(consumption) quantity
for 10 cm thick roof slab (1:2:4)

Answers were Sorted based on User's Feedback



what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)..

Answer / pradeep tk

as volume-----
for 1 m3 concrete, volume=1m3
propotion=1:2:4

ie, volume of cement=1*1/7

=0.142 m3
volume of sand=2*1/7
=.285 m3
volume of aggregate=4*1/7
=0.571 m3

for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3

sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m3

Is This Answer Correct ?    11 Yes 5 No

what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)..

Answer / aamir mushtaq shah

for 1 m3 concrete, volume=1m3
propotion=1:2:4




ie volume of cement = (1/sum or ratios)*1.52*30

6.5 Bags of Cement
volume of sand=
=0.43 m3
volume of aggregate=
=0.86 m3

for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3

sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m

Is This Answer Correct ?    0 Yes 1 No

what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)..

Answer / parminder singh

we consider the 10 cm thick slab and 1 m squre area
volume of slab = .1 cu m
wet concrete volume is same as volume of slab
for .1 cum wet concrete = 1.5 time required dry
material
therefore total dry volume require = 1.5* .1 = .15
volume of cement =.15/7 = 0.0214 cu m
bags = .614
volume of sand = 0.0214*2 = .0428 cu m
volume of course aggregate = .0856 cu m

Is This Answer Correct ?    1 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

WHAT IS FLOOR AREA RATIO? Y IS IT NECESSARY? HOW TO CALCULATE IT?

1 Answers  


How much steel required in 900 square feet slab?

17 Answers   RCC, Sai Steel Corporation, TATA,


what is fe 415 steel

15 Answers   L&T, Nabard, Rahul Computers,


how to calculate cut length of for a triangular portion for steel ?

0 Answers   Shashi,


how to convert sand in Cft to Kgs

0 Answers  


what is the productivity in aluminium shuttering per day

0 Answers  


What is difference between target mean strength and compression strength of concrete?

1 Answers  


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

0 Answers  


Explain what is Critical Path Method (C.P.M)?

0 Answers  


how do you intend to overcome such challenges?

1 Answers   Savanna Energy,


Laboratory experiments conducted in Mumbai on a particular mix showed a strength of 33 MP a for a fully matured concrete. Find whether formworm can be removed for an identical concrete placed at Jammu at the age of 15 days when the average temperature is 60C. The stripping stress in concrete

2 Answers   CCIL,


which type of materials should be used for framed structure???

9 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)