what"s the cement, sand, aggregate(consumption) quantity
for 10 cm thick roof slab (1:2:4)
Answers were Sorted based on User's Feedback
Answer / pradeep tk
as volume-----
for 1 m3 concrete, volume=1m3
propotion=1:2:4
ie, volume of cement=1*1/7
=0.142 m3
volume of sand=2*1/7
=.285 m3
volume of aggregate=4*1/7
=0.571 m3
for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3
sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m3
Is This Answer Correct ? | 11 Yes | 5 No |
Answer / aamir mushtaq shah
for 1 m3 concrete, volume=1m3
propotion=1:2:4
ie volume of cement = (1/sum or ratios)*1.52*30
6.5 Bags of Cement
volume of sand=
=0.43 m3
volume of aggregate=
=0.86 m3
for this slab we consider 1 m2 of .10m thick
volume of concrete in 1 m2 slab =1*1*.1
=.1 m3
for that volume,,,,,,cement=.142*.1
=.0142 m3
sand =.285*.1
=.0281 m3
aggregate=.571*.1
=.0571 m
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / parminder singh
we consider the 10 cm thick slab and 1 m squre area
volume of slab = .1 cu m
wet concrete volume is same as volume of slab
for .1 cum wet concrete = 1.5 time required dry
material
therefore total dry volume require = 1.5* .1 = .15
volume of cement =.15/7 = 0.0214 cu m
bags = .614
volume of sand = 0.0214*2 = .0428 cu m
volume of course aggregate = .0856 cu m
Is This Answer Correct ? | 1 Yes | 5 No |
Ratio of cement : sand for fixing slab and tiles in the floor and also quantity of cement and sand requires for laying slab and tiles separately (area 100 sq. ft)
What is the formula to calculate the volume of mortar required for a wall with 1245 blocks with a stndard size of 440x215x100?
What is full form of SNF base in concrete mix design for admixture percentage?
cement mortar 1:6 explain the cement and sand coefficient calculation?
rasio for outer plaster thickness for wall
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?
1 Answers LiveCon, Sobha Developers,
what is the unit of heat of hydration?
What is the permissible limit of silt contain in sand for rcc Work?
plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?
How to Calculate in measurement RCC Colo um Spred design for Billing
what is a exact size of a cube?