Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"

Answer Posted / tipu sultan

standard size of brick
=(.19×.09×.09)m

volume of brick
=(.19×.09×.09)m^3
=0.001539
=0.00154m^3

with mortar brick size
=(.20×.10×.10)m
& volume=
=(.20×.10×.10)m^3
=0.002m^3

for volume 0.002m^3 then no. of brick=1

so that
for 1m^3 then nos. of brick = 1÷.002 = 500nos.

Is This Answer Correct ?    136 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what else we can add rather than admixture in concrete to reduce the cement quantity?

6104


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

2160


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1882


Why are separation membranes used between concrete pavement slab and sub-base?

1311


How does a traffic light signal work ?

2247


how much need sand and cement for 1 cft roof construction?

4383


.5Ast

1733


can stub column take the load as main column

1862


how to convert sand in Cft to Kgs

1889


What is portland cement

7965


How to estabilish reinforcement Steel rolling margin for a building projects ?

4117


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

2122


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1587


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

2312


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2253