1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / hussain
Volume of 1 Brick = 0.230*0.115*0.075 = 0.002
So No of brick req for 1 m3 = (1/0.002) = 500 Nos
1.7 bag of Cement required
0.31 cum sand required for 1 cum of brickwork
| Is This Answer Correct ? | 717 Yes | 234 No |
Post New Answer View All Answers
Does brick grows bigger every year?
Please design 12.5m long dubbly beam
how to calculate total cost for slab 35'×8'
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
How do you calculate the unit weight of concrete?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
why is the column design?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
Write short note on construction programme for pile foundation.
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
what is diversion?
What is command line?
plumbing CPVC fitting FTE Brass full form