1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / raja j
brick size in meter=.23*.115*.075 =.0019
add 10 mm mortar for ech sides=(.24*.125*.085)=(.0025)
bricks required for 1 m3 =(1/(0.0025)=400 nos
mortar required =(.0025-.0019)*400=.24
add 15% for wastage = (.24*1.15)=.276m3
so required sand is =.276 m3
cement is =(1440/6)=240*.276= 66 kg
| Is This Answer Correct ? | 283 Yes | 135 No |
Post New Answer View All Answers
Forces in a Shear Wall are in plane or out of plane ?
how i can tak Quantity of mortar in block work
What is the l/d ratio of cantilever beam?
Different sizes of Hollow blocks and its weight. Thanks.
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
All aptitude question of Bechtel
In the roof of a pumping station explain briefly the components of a waterproofing system?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
How high should the water tank be to provide a 60 psi at base of this water tower?
The concrete slump recommended for beams and slabs; is?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
How much time Required for PPR pipe network testing
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.