1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / akhtar shaikh
Answer is : 6
Because as per the math rule
first equation will be 1 x 0 = 0
then 1+1+1+1+1+1+1+1+1+1 - 0+1+1+1+1+1+1
= 6
| Is This Answer Correct ? | 1 Yes | 14 No |
Post New Answer View All Answers
how much one carpenter can doing shuttering of slab in one day
In cement making,what is meaning of blend,fineness,density.
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
How many are the types of joints?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
Define What is rigging?
How many types of slabs are there & how to design it?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What do we mean by partial moment release ??
How much quantity of rod binding work by a rod binder per day
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?