1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 +
1 + 1 x 0 = answer??? pzl tell the rite answer ??
Answer Posted / akhtar shaikh
Answer is : 6
Because as per the math rule
first equation will be 1 x 0 = 0
then 1+1+1+1+1+1+1+1+1+1 - 0+1+1+1+1+1+1
= 6
| Is This Answer Correct ? | 1 Yes | 14 No |
Post New Answer View All Answers
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
cement and sand required for one block of size 0.23*0.15*0.46
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
rate analysis for cement pointing 1:4 , for 100 sq m
The definition of national highway
Draw the cross section of a boundary wall and label its part with detailing?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What is Joule Brayton Cycle?
What are the methods of measurement? Describe it shortly
Does VDF add strength to the flooring apart from preventing water ingress?
five requirements of infill panels for walls?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
how can calculate cutting length of diamond ring