sir when can we expect the AEE results and when will be the
interviews sheduled please guide us in this regard
thanking you
No Answer is Posted For this Question
Be the First to Post Answer
concrete strenght is increased if using sisal fibre in concrete?
how to check the quality of concrete
which is cost effective Steel Structural or Concrete Structure building?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is the use in canals of longitudinal drains and cross drains in lining areas?
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
what is the unit of heat of hydration?
How foundation is designed, Column design and beam design
0 Answers College School Exams Tests, L&T,
WBM Road aggregates quantity calculation
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)