sir when can we expect the AEE results and when will be the
interviews sheduled please guide us in this regard
thanking you
No Answer is Posted For this Question
Be the First to Post Answer
how we can estimate the M50 concrete for foundation?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
how to determine the foundation footing reinforcement spacing
in a building what is the thickness of a wall in metres? dafault wall value?
where can i get the previous question papers for rrb section enginerr (civil)
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement
Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
waht is the angle of reposae
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
difference between nominal mix and design mix difference between nominal size and actual size of brick,aggregate etc
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)