Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what should be the strength of Concrete cube strength for 7
days, if the designed mix is M20?

Answers were Sorted based on User's Feedback



what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / thiraviam

strength will be 65%

Is This Answer Correct ?    5 Yes 12 No

what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?..

Answer / ajay rai

almost 25.00Kg/sq.cm.

Is This Answer Correct ?    2 Yes 13 No

Post New Answer

More Civil Engineering Interview Questions

what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?

3 Answers   Ashok Leyland, Marathon Realty,


What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?

0 Answers  


wat is six sigma course ? is it good for civil engineers . wat is pmp certification ? is it good for civil engineers .

1 Answers   CCCL,


What is the curing period for Epoxy grouts

1 Answers  


what is rigid pavement

3 Answers  


what"s the responsibilities for QC(quality controler)in high rise buildings?

5 Answers   Ashok Leyland,


How calculate the water for 1m3 concrete

6 Answers   DLF,


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

0 Answers   NA,


difference b/w stress and strength

3 Answers   BMS,


If 16 mm dia hysd bar of grade Fe500 is needed in a beam but it is not available in the construction site but the beam has to cast in an emergency. Which dia of bar is to be used for for that situation? (If greater than 16 dia bar is not available at site)

2 Answers   Shreeji Associates,


how to calculate concrete pouring of foundation

2 Answers  


Manpower required for de shuttering of conccrete slab

1 Answers   Ameco,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)