which type of cement is used for RCC construction?Why?

Answers were Sorted based on User's Feedback



which type of cement is used for RCC construction?Why?..

Answer / syed murtuza qadri

Ordinary Portland Cement shalll be used for Super structure
RCC construction and SRC sulphate resistance cement shall
be used for sub structure.

Is This Answer Correct ?    41 Yes 3 No

which type of cement is used for RCC construction?Why?..

Answer / sjtbehera

yes OPC 53 grade are used in rcc

Is This Answer Correct ?    17 Yes 2 No

which type of cement is used for RCC construction?Why?..

Answer / kavipriya m

43 & 53 grade of ordinary portland cement uses in RCC construction.

Is This Answer Correct ?    7 Yes 1 No

which type of cement is used for RCC construction?Why?..

Answer / jai

OPC with some % of fly ash or PPC

Is This Answer Correct ?    5 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

rate analysis of shuttering

2 Answers  


in 100 cft = 1350 bricks in 100 cft = ? bloks

0 Answers  


whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is the procedure of calculation?

1 Answers  


How to calculate volume of concrete & steel on tank foundation & ring wall ?

0 Answers  


In Rcc work what ratio we need?

2 Answers  






What is the basic difference between construction and infrastructure

1 Answers  


whatis the banafit of water leak detection and repair?

2 Answers  


How do we calculate the building footing calculation ?

7 Answers   Dodsal, L&T,


sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????

0 Answers   L&T,


What is the density of Cement, Fly ash,20 mm aggregate, 10 mm aggregate and stone dust?

14 Answers   Amrapali, Egis, Himuda, Indramas, L&T,


How Many Cement Bags Are Used in 1 Sqm Area for Plaster????

8 Answers   Era Infra Engineering, FactSet Systems, Indu Projects, L&T, Reliance, Rites,


How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)