What is the Systematic Responsibility Site Engineer?
Who are the above and under co-oridinating ? What is office
& Site co-ordination of Site Engineer?
No Answer is Posted For this Question
Be the First to Post Answer
How to find out kg per Sft ?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
How manu days after the casting of a slab another slab can be casted above it? what is the total curing time of a slab if ponding is not done on it?
Please tell me how to calculate the stiruup length for rectangular and circular coloumns
how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3
0 Answers Ajnara Group, Assosa University,
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
Define the various stages of the project planning process in construction.
what is the stirrups? and which condition it is used?
what is detail procedure of eccentric footing? plz. give solved exmple?
what is levelling staff least count
the coefficient of curvature for a well graded soil must be inthe guage 0.5-1 3-4 4-5 none
the internal dimensions of a ware house are 15m *5.6m and the maximum height of piles is 2.70m find the maximum numbers of bags to be storedin two piles
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)