a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answers were Sorted based on User's Feedback
Answer / er shailesh kr srivastava
A)CUTTING LENGTH FOR 8mm Strips=2(250+400-2*80-2*8+24*8)
2(650-160+22*8)
2(490+176)
=1332mm
same as for beam
| Is This Answer Correct ? | 6 Yes | 9 No |
Answer / ajay
sir , my name ajay kumar ,working on site i also had the
same problem of estimation , but sir ur answer was so nicely
explained , im very thank full to u for ur valuable and
precious information, sir can i no ur email id and no so i
can get some knowlege from u ?
my email -ajaykapse2@gmail.com
| Is This Answer Correct ? | 6 Yes | 10 No |
Answer / ram bhawan
2(A+B)+16*DIA OF STIRRUP BAR
A = INNER HEIGHT OF STIRRUP
B = INNER BREATH OF STIRRUPS
IF CLEAR COVER IS GIVEN (COVER GIVEN FROM STIRRUP NOT FROM
MAIN BAR)
| Is This Answer Correct ? | 2 Yes | 9 No |
Answer / silpa
250-25+8=233mm,
400-25+8=383mm
2(0.233+0383)+16*0.08=2.512m
| Is This Answer Correct ? | 9 Yes | 32 No |
Answer / anthony victor bernard
a)250-column cover both side+8*dia of rod
400-column cover both side+8*dia of rod
so cutting length is (.200+.350)*2+(2*5*.008)
=1.180 mts
(b)cutting length is (.150+.355)*2+(2*5*.008)
=1.090 mts
(c)cutting length is (.100+.350)*2+(2*5*.008)
=0.980 mts
| Is This Answer Correct ? | 11 Yes | 38 No |
a)250-column cover both side+8*dia of rod
400-column cover both side+8*dia of rod
so cutting length is (.250+.400)*2-.160+.128
=1.268 mts
same as (b)
| Is This Answer Correct ? | 37 Yes | 65 No |
Why camber is provided?
2 Answers G R InfraProjects, Tata Steel Limited,
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
how to find the percentage for minimum reinforcements as per IS:456 for beam , column, slabs.??
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
what is the difference between TOR & TMT
What is kn measurement?
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
As an engineer, what u should do when the construction of a building doesn't meet the required specifications?
how much weight of 20 mm aggregate in bras?
how to find quantity of total concrete, cement bags and sand. for any ratio
1) What is the compressive strength of concrete 2) What is the tensile strength of steel 3) Why cracks are happening in walls
How much is the curing time period?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)