a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / neelakantam
a)250-column cover both side+8*dia of rod
400-column cover both side+8*dia of rod
so cutting length is (.250+.400)*2-.160+.128
=1.268 mts
same as (b)
| Is This Answer Correct ? | 37 Yes | 65 No |
Post New Answer View All Answers
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
Coverage of 25mm.thick ratio of 1:4 cement mortar?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
When column of building is abutting the boundary line,then suitable footing advised is
How much quantity water should be placed in one cubic meter area?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
howto calculate the quantities of material used in fly ash brick after finding the volume??
importance of the soundness test to determine the quality of cement use for any construction
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
Define What is aggregate?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters