Method of findingthe dry ingredient quantity of 1 m3 concrete.

25 188428

What is Compensation?

19 40438

Tell us your experience in cost accounting?

1728

what is Quality Reporting?

5 24499

The full form of NCC is (A) National Coastal Corporation (B) National Cadet Corps (C) National Credit Corporation (D) None of these

9 11203

what are IS code for M20, 25, etc

40 74903

What is mean CT Saturation? How to calculate?

13 108207

What is the TDS Rates for the F.Y 2008-09 ?

11 24636

what is MAR

1 4581

What is meant by 'zero value' in quantity surveying.

10 40503

DIFFERENCE BETWEEN POWER AND CONTROL CABLES

9 38100

What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?

49 221484

what is the function of anti-pumping in circuit breaker?

20 111615

what the purpose of data retrivala panel in substation

1 3974

why Line voltage =1.732XPhase voltage what mean by 1.732

4 21166

Post New NCC Interview Questions




Un-Answered Questions

How to find the unique values if the value in the column is repeated?

559


Define how to clone a git repository via jenkins?

1


how can you implement fine-grained auditing?

607


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2238


Why do we need viewmodel in mvc?

1






How does the on-delete-cascade statement work?

608


What willbe change in programming when we use 5/3 solenoid inplace of 5/2 in operating of a cylinder?

1618


Declare on change?

190


What is updatedb?

590


Which annotation is used to declare a class as a hibernate bean ?

166


You are developing your project schedule and have decided to use the PERT method to determine project duration. The estimates you've gathered so far include the following: Most likely is 200 hours, optimistic is 180 hours, and pessimistic is 220 hours. Which of the following is the correct PERT estimate? A. 190 B. 266 C. 200 D. 210

535


Is the unit and normal value fuel ratio of an average diesel engine?

1816


What term is used to refer to the first domain created in a new active directory tree?

112


According to, Fair Debt Collection Practice Act, who are the third parties that the bill collector, can deal with while trying to collect a debt?

628