How much is the curing time period?
Answer / saquib hassan
To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020
| Is This Answer Correct ? | 0 Yes | 0 No |
What is minimum tensile strength required for structural steel works ?
indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?
how to calculate the quantity of material in 1 cubic meter Concrete?
How to take steel quantity for beams ?how to calculate stirrups
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What is meant by 'zero value' in quantity surveying.
10 Answers DLS, Gammon, HCC, NCC,
How to Calculate in measurement RCC Colo um Spred design for Billing
what is stub column ?
give an example for cantilever structure
how we can design the design mix(m25)
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)