How much is the curing time period?
Answer / saquib hassan
To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020
| Is This Answer Correct ? | 0 Yes | 0 No |
rimmer in pile foundation
Highest compressive strength of M15 concrete that can be gained at 28 days
Why is the statue of liberty made of copper?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
what is the bar bending schdule
the plan area of a building 10*15 of superstructure 0.30 then plinth area is
what"s the purpose of dry lean concrete(DLC)and where it"ll be use it?
What is the maximum cement content allowed in RCC?
which chemical is used for corroded steel
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
Define What is the difference between routing maintenance and major maintenance in school facilities?
How to calculate the sand and aggregate in concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)