How much is the curing time period?
Answer / saquib hassan
To get the strongest finish out of your new concrete slab for years to come we suggest taking the time to properly cure your new slab for at least 7 days after installation (28 days is ideal). Curing is the process of controlling the rate and extent of moisture loss from concrete during cement hydration.10 Mar 2020
Is This Answer Correct ? | 0 Yes | 0 No |
what is civil engineering?
2 Answers CPWD, drda, Jal Nigam, NHPC, Uttar Pradesh Jal Nigam,
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
what are the values of compressieve strenght?
how new RCC roof joined with existing RCc roof
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
0 Answers Ascent Constructions,
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
Whats maxi. slump of M-7.5 Concreit for PCC
2 Answers Indiabulls, Swastik Group,
What do mean by freeway ?
16. What do you consider to be your greatest achievement so far and why?
how much overlap i must to provide in column 16mm dia bar and if i want to save steel by doing welding then how much over lap must be?
3 Answers Bin Hamda Trading Contracting,
How many required water of 1m3 Brick masonary and slab casting?
1 Answers Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),
how to stop beam concrete between column