We have one Energy meter for Measuring the
voltage,current,power,energy(KWH,KVARH,KVAH) & power
factor.The problem is that the meter does not show whether
the PF is lagging or leading.So i want to know that is
there any way or calculation to find out that whether the
PF sign (lagging or leading) depending upon the above
mentioned parameters?
Answers were Sorted based on User's Feedback
Answer / john
Is this a revenue meter from the utility company or a power
quality meter? In the case of a power quality meter, there
should be something letting you know if your PF is in a lead
or lagging. I have an Amprobe DMII Pro and it showes an i
after the PF to indicate lagging, .98i, and a c to indicate
leading, .98c. I have also seen meters with lagging PF -0.98
and leading +0.98. Another simple thing you can do is look
at your VAR, if it is in the negative, your in a lead.
As far as a revenue meter from the utility company is
concerned, call the utility company and ask them.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ram
please check the meter must be indicating sign as +
(leading) or - (Lagging) power factor.
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / ds01151
By using the formula KW/KVA you can find the pf
| Is This Answer Correct ? | 2 Yes | 4 No |
Answer / ashwini
by using formula p=vicos(pf) v can calculate power factor......
| Is This Answer Correct ? | 1 Yes | 9 No |
What is maximum AC & DC transmission voltage in India? and where?
11. As per the theory current doesn’t flows in Neutral, but practically it is not applicable, explain why? 12. How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test? 13. Why the transmission lines are in 11kV, 22kV, 33kv, and why not 10kV, 20kV, 30kV? 14. Why do we generate 3 Phase AC Supply? It is possible to generate 4 Phase and 5 Phase explain it? 15. Explain why the Voltage drop will happen in 3 Phase line? 16. What is the equipment used to control the generator output? 17. What are the factors to be considered during the Synchronization? 18. What should be value of Circuit breaker operating time and tripping time? 19. Why the CT Secondary is rated as 5A generally? 20. At which time Synchronous generator act as a Synchronous Condenser?
what is the difference between ACTIVE POWER and REACTIVE POWER.I WANT CLEAR ANSEWER.
What is mean by PID controller? And what is its Long form?
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
how does a liquid starter reduce the starting currents?
what kind of quetions will ask in BHEL in interview? Plz help me?
what are the preventive maintanance actions taken for air circuit breaker? please answer me
what is maximum demand.
what is the full form of MEMO? name of memo train.
how do you measure earth leakages in 3phase wires?
what is mean by xlpe swa pvc
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)