is there any difference in reading or error in value, if we
connect the R phase in Y terminal and Y phase in R terminal
of electronic energy meter of 11 kv feerders???
Answer / k.prakashchandra
No. But corresponding CTs and PTs should not be
altered.Please note that the R, Y, B phases of one station
may be different from those of another station.In case of 11
KV, only phase sequence is considered. Energy recorded by
energy meter is the sum of individual measuring elements..
| Is This Answer Correct ? | 2 Yes | 0 No |
Which motor runs on both ac and ac? a) dc series motor b) reluctance motor
if 300 hrs not comleted at wat interval b.c,d checks og take place
What are applications of Shunt release?
2 Answers Techno Electric and Engineering,
what is capacitor voltage transformer?? how it is different from potential transformer?
why the supply power frequency is 50hz in india? where as it is 60hz in US?
1 kva how much amps? How to calculate ?
The size and construction of bushings in a transformer depend upon?
How many types of probe used in cro?
What is circuit breaker failure protection?
in most industies hormonics present up to some level. what is limit ? and there effect?
how to calculate a cable size while load is given in amp or kw and length is also define.?
How the soft starter control the starting current in three phase squirrel cage AC Motor?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)