sir i have applied for isro-09.
still i did not got the HALL TICKET.
Answers were Sorted based on User's Feedback
Answer / pinky
Go to isro website and check the status of ur application
once by giving ur registration number and date birth.
| Is This Answer Correct ? | 3 Yes | 0 No |
1.how many earth pits are required for 1000 k.w plant include substion , transformer ? 2. how many earth pits are required for 500kva generator.what is formula to calcute?
What are the section criteria for cables. Now everywhere XLPE power cable is used or PVC is also used?.
Advantages of Induction Motors
If o/p power is doubled by how much does the sound increase
transform oil how going to act like ainsulation purpose
Why we Do not connect the windings of the motor in delta? & what would happen if we do that? I mean the winding themselves not the three lines that are coming to the motor?
why the indian frequency is 50 hz & U.S.Frequency of 60 hz
which protection used in power plant?
How the real power output is controlled in a Generator?
What is the difference between KW & KVA ?
can we use ordinary transformer in place of autotransformer?give reasons also
what is model question rrb junior engineer electrical gr.II
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)