sir i have applied for isro-09.
still i did not got the HALL TICKET.

Answers were Sorted based on User's Feedback



sir i have applied for isro-09. still i did not got the HALL TICKET. ..

Answer / pinky

Go to isro website and check the status of ur application
once by giving ur registration number and date birth.

Is This Answer Correct ?    3 Yes 0 No

sir i have applied for isro-09. still i did not got the HALL TICKET. ..

Answer / s r khan,swadesh

forget ISRO.apply for NASA.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How a generator is positioned in a hydroelectric power plant?

10 Answers   Infosys,


Hi If connecting a temp generator 670KVA .415kv with step up Tx .415/11kv. I am given Generator impedances Z1 Z2 Z0 to 100MVA base. Do I need to work out the generator fault current by using these impedances i.e gen rating / impedance. Then use this as my source impedance for the calculations that follow.

0 Answers  


HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER

0 Answers  


How we can find the regulation of transformer?

2 Answers  


no EB power DG is not starting?

6 Answers  






HOW TO CONVERT SQ MM OF A CABLE TO DIAMETER, EG. CABLE SIZE IS 185SQ.MM WHAT IS THE DIA OF THE CABLE??????????????

3 Answers   Parsons, SWAN,


Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?

0 Answers  


Is there any calculation to find unknwon(unferroled) phases R Y B in alternator,3 phase motor anybody shoot my problem. how can we notice this is the respective phase?

3 Answers  


how to calculate energy meter multipling factor by ct & pt raitio

2 Answers  


what is the difference between switchgear and circuit breakers and is there any difference between outdoor and indoor switchgear and circuit breakers , and how would you differentiate between switch yard and substation and grid station . thanks

0 Answers   ABC,


checklist of ELCB

1 Answers   EECE,


what is the maximum load in MDB,SMDB and DB

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)