How a generator is positioned in a hydroelectric power plant?
Hi If connecting a temp generator 670KVA .415kv with step up Tx .415/11kv. I am given Generator impedances Z1 Z2 Z0 to 100MVA base. Do I need to work out the generator fault current by using these impedances i.e gen rating / impedance. Then use this as my source impedance for the calculations that follow.
HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER
How we can find the regulation of transformer?
no EB power DG is not starting?
HOW TO CONVERT SQ MM OF A CABLE TO DIAMETER, EG. CABLE SIZE IS 185SQ.MM WHAT IS THE DIA OF THE CABLE??????????????
Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?
Is there any calculation to find unknwon(unferroled) phases R Y B in alternator,3 phase motor anybody shoot my problem. how can we notice this is the respective phase?
how to calculate energy meter multipling factor by ct & pt raitio
what is the difference between switchgear and circuit breakers and is there any difference between outdoor and indoor switchgear and circuit breakers , and how would you differentiate between switch yard and substation and grid station . thanks
checklist of ELCB
what is the maximum load in MDB,SMDB and DB